Manufacturing ERP with MRP and production planning built in
Plan production against real capacity, cost every job as it runs, and stop discovering margin problems a month after dispatch.
- Bills of materialMulti-level BOMs with variants, phantom assemblies and routing operations.
- Work ordersReleased against capacity, tracked through each work centre with real timings.
- Job costingMaterial, labour and overhead posted as they are consumed, not estimated later.
- MRPDemand from confirmed orders and forecasts, netted against stock and open purchases.
- A production plan the floor actually works to
- Job margin visible while the job is still open
- Shortages flagged before they stop the line
What this replaces
If any of these sound familiar, the problem is usually not effort. It is that the information lives in more than one place.
- Production plans live in a spreadsheet that is out of date by Tuesday.
- Job costs are reconstructed after the fact, so margin is a guess.
- Shop floor progress is reported verbally, if at all.
- Material shortages surface when the line stops, not when the order is taken.
What the manufacturing module does
Configured to your process during implementation, so these are starting points, not a fixed template you have to bend around.
Bills of material
Multi-level BOMs with variants, phantom assemblies and routing operations.
Work orders
Released against capacity, tracked through each work centre with real timings.
Job costing
Material, labour and overhead posted as they are consumed, not estimated later.
MRP
Demand from confirmed orders and forecasts, netted against stock and open purchases.
Quality checks
Control points on receipt, in process and before dispatch, with failures routed back.
Maintenance
Preventive schedules on equipment, so downtime is planned rather than suffered.
It is one system, not eight products
Manufacturing posts into the same ledger and the same stock as everything else, which is the entire point of running an ERP rather than a stack of tools that need syncing.
Manufacturing ERP questions
If yours is not here, ask it. We answer these the same way on a call.
Yes. Bills of material can nest to any depth, carry phantom assemblies, and hold variants so a product family shares one structure instead of a separate BOM per size or colour. Routing operations sit on the BOM, so a work order knows both what it consumes and which work centres it passes through.
MRP nets demand from confirmed sales orders and your forecast against free stock, work in progress and open purchase orders. What is short becomes a purchase suggestion or a work order suggestion depending on whether the item is bought or made, with the lead time you have set on the item deciding when it has to be raised.
Yes, and that is the point. Material is costed as it is issued, labour as it is booked against a work centre, and overhead by the rule you configure. A work order therefore shows consumed cost against planned cost while it is still open, so a margin problem is something you act on rather than something you discover after dispatch.
Work centre screens are built for a tablet at the machine: the operator sees the queue, starts and stops the operation, records quantity produced and scrap, and flags a quality failure. There is no data entry that duplicates paperwork, which is usually why floor reporting fails.
See Manufacturing running on your own numbers.
We will walk through your current process, show the module handling it, and tell you what implementation would involve, before you commit.
